European Union in Mozambique assesses Mphanda Nkuwa Project Implementation Status
A Head of Cooperation mission from the European Union Member States present in Mozambique recently made
Estima-se que a central hidroeléctrica de 1.500 MW venha a ter o custo de produção de energia mais baixo de todas as centrais eléctricas existentes em Moçambique e na região, constituindo uma proposta de investimento atrativa.
A Head of Cooperation mission from the European Union Member States present in Mozambique recently made
Representatives of the Japanese International Cooperation Agency in Mozambique, JICA, recently visited the site of the
The Government of Mozambique, through the Ministry of Mineral Resources and Energy (MIREME), represented by the
As part of its institutional capacity building policy, the Mphanda Nkuwa Hydroelectric Project Implementation Office (GMNK)
The Mphanda Nkuwa Hydroelectric Project Implementation Office (GMNK) participated in the 58th Edition of the Maputo
Maputo, 26th May 2023 – The Ministry of Mineral Resources and Energy (MIREME), through the Mphanda
The Fundo de Energia, EP (FUNAE) and the Mphanda Nkuwa Hydroelectric Project Implementation Office (GMNK) recently
GABINETE DE IMPLEMENTAÇÃO DO PROJECTO HIDROELÉCTRICO DE MPHANDA NKUWA
Mphanda Nkuwa is the largest hydroelectric project under development in Mozambique. Its low energy production costs are expected to be among the lowest in the region, combined with relatively limited environmental and social implications.
© 2022 – GMNK, All rights reserved
Developed by ITMZ